Beckenham High Street Improvements Update 17th July 2107

Improvement Works Update, Monday 17th July, courtesy of F M Conway, contractor for the works:

Work for weeks commencing the 17th July 2017. 

·         At the corner of Church Avenue and High Street; kerb, drainage and traffic signals work will continue.

·         Kerb laying and paving continuing north from Church Avenue.

·         The construction of the new planters on Beckenham Green will continue.

In order to ensure the completion of Phase 2 on programme Conway’s will be working extended hours to 8pm and at the weekend.

For reference, in the week commencing the 24th July 2017 the paving adjacent the planters is anticipated to commence.

Previous completed works 

·         Footway excavation and sett laying between Belmont Dry Cleaners and The Dance Studio.

·         Construction of the parking bays between The Dance Studio and Lloyds Bank.

The completed scheme 

Feedback from the community has revealed that there are some incorrect preconceptions about the scheme :-

    • The asphalt at Thornton’s Corner is a temporary measure until the granite paving is laid.

    • The High Street will not be pedestrianised. Improvements will however greatly improve the pedestrian environment with wider pavements, improved lighting and more and better road crossings.

     • After the improvements are complete the High Street will revert to two way traffic as prior to the improvements. The larger widenings such as the North-West corner of Thornton’s Corner have been designed to enable the largest road vehicles to comfortably navigate the corner in both directions. Changes to the vehicle stop lines and traffic signalling will enable vehicles to use the reduced road space with minimal impacts on traffic flows.

   • No existing bus stops will be removed from the High Street. All bus stops will however be improved and will become fully disabled accessible. In order to create sufficient waiting space for passengers some bus stops will be located on what is the highway at present. 

    • The scheme will not introduce shared surfaces where the footway and road surface will be on the same level. Throughout the scheme a kerb will be retained and the pedestrian areas will be a traditional pavement above vehicular areas except at crossing places. 

Further information can be found at www.bromley.gov.uk/beckenhamimprovements

A Big Thank You 

Increasingly the project team and FM Conway have been receiving compliments about the improvements and the site contractors. Thank you for these. It is also much appreciated that businesses are working with and acknowledging that the site contractors of FM Conway are endeavouring to minimise disruption as much as possible.

We are aware that the works do cause noise and disruption. FM Conway will try and minimise the space for materials storage outside Beckenham Green as soon as possible. In the meantime thank you for your patience if you are affected.

About the scheme 

The scheme is designed to make the town more attractive to visitors and shoppers by day and night. A major objective is to support existing businesses and encourage new businesses to invest in the town centre. The High Street investment improvements will create a more attractive and safer pedestrian environment. Improvements will include new paving and road surfacing, improved and attractive lighting, improved road crossings and bus waiting facilities, better facilities for cyclists and improved amenity spaces including Beckenham Green.

Extensive planning and consultation has been carried out since the scheme was proposed in 2012. The cooperation and input of the ‘Town Centre Team’ and its members including the Beckenham Business Association, The Beckenham Society and the Copers Cope Area Residents’ Association is gratefully acknowledged, with their input key in shaping the nature of the scheme.

Leave a comment

Filed under Council, Environment, News, Transport

Beckenham Perception of Safety Survey – 7 quick questions – please assist

Bromley Council , the Copers Cope Area Residents’ Association and the Beckenham Town Team are working to re-qualify Beckenham’s Purple Flag Award (find our more about Beckenham’s Purple Flag status below).

We need your help to understand perceptions of the night-time economy with in the Purple Flag area and feelings of safety. Most grateful if you can take the 2 minute survey below

Beckenham Purple Flag – Perceptions Survey

Beckenhams Purple Flag Story

In February 2014 the Beckenham Town Centre Team (chaired by the Copers Cope Area Residents Association) decided Beckenham should try to achieve the Purple Flag award: the evening economy was often a source of complaint for local people, and the Purple Flag is a great way to make improvements and change perceptions.

The Purple Flag is awarded by the Association of Town Centre Management (ATCM) to towns and cities that can demonstrate excellence in managing their night-time economy. Similar to the Blue Flag for great beaches and the Green Flag for great parks, the Purple Flag is for towns with diverse and safe evening and night-time economies.

Over the following 12 months a small steering group involving Bromley Council Trading Standards, Bromley Council Licensing, Beckenham Business Association, West Beckenham Residents’ Association, Churches Together, Street Pastors, a representative from Beckenham’s licensed premises and, of course, the Copers Cope Area Residents’ Association worked together to make this idea a reality.

In January 2016 Beckenham was awarded the Purple Flag, and at the time was one of only 42 places in the country to have been awarded it. What impressed the awarding body most was the input and collaboration from the two residents’ associations representing local people. The ATCM was so impressed it has asked for Beckenham to be used as a case study to demonstrate the importance of resident groups in town centre management. Beckenham is the first town to be awarded the flag as a result of joint efforts from residents, businesses, and the Council – usually applications are driven by the council or businesses.

The ATCM were also impressed by the diverse offering of Beckenham’s evening economy. They especially liked the programme of events at St Georges Church, the mix of old pubs and new bars and the variety of restaurants. The Alleyway Naming Project  (delivered by the Copers Cope Area Residents Association with much support from the Town Centre Team) was another area that sparked their interest and demonstrated a local interest in heritage and the plan to make these alleyways attractive and safer, especially at night.

So what did it take to get the flag?

There were many walk-arounds by volunteers from 5pm to 1 or 2am to assess how well the town centre coped with increased clientele at the weekend in the restaurants and bars. Local people and some patrons, door personnel, and bar/restaurant staff were surveyed for their views on Beckenham’s night-time economy. The key areas of concern included:

  • Dispersing crowds on Friday and Saturday nights – noise and potential for anti-social behaviour.
  • Queues for taxis, and the Kebab shop queues after the clubs had shut.
  • Radio and CCTV capacity to ensure the police and licensed premises could deal with any anti-social behaviour quickly and efficiently.
  • Street cleaning of the town centre through the weekend evenings to ensure the town remained pleasant for all.

As part of the application for the Purple Flag the following was achieved:

  • The radio system was upgraded and all licensed premises signed up ensuring licensed premises and the Police could remain in contact throughout the night.
  • A taxi queuing system was introduced by New Regency Cars to streamline the queues for taxis on Friday and Saturday nights.
  • Taxi marshalls have been deployed at Regency cars and at the taxi rank outside Marks & Spencer.
  • Door staff have been retrained to spot and aid vulnerable people leaving the clubs (eg those who have had too much to drink).
  • The Kebab shop on The Bridge now employs a door-person on Friday and Saturday nights to keep order.
  • The location of CCTV was reviewed to ensure the views were maximized.
  • Wellbeing packs were provided to all late night establishments to ensure they had the minimum kit to deal with revellers who had over indulged.

The most telling sign of success was last Christmas when the number of incidents related to late night drinking fell significantly in Beckenham whilst the rest of the borough saw an increase.

Purple Flag status lasts for two years and the town will need to maintain and hopefully improve standards in order to re-qualify.

2 Comments

Filed under Council, Environment, Licensing

Beckenham Improvement Work Update 3rd April 2017

Improvement Works Update, Monday 3rd April, courtesy of F M Conway, contractor for the works:

 

Beckenham Improvements work update

Work for the week ahead 

Work on the raised footway between the Nat West and the steps will be completed.

Customers requiring the ATM will have to access this via the steps on the lower section of the High Street.

Works underway outside Kinleigh Estate Agents will be completed by early next week together with the work on the opposite corner adjacent to Beckenham Green. All barriers will be removed at both of these points by early next week.

Work will continue along the section of the High Street between Albemarle Rd and Bromley Rd but will temporarily stop just short of the Church Entrance in preparation for Easter celebrations.

Work to replace the pedestrian refuges at the junction of Rectory Road and High Street will commence as part of the upgrade work, in preparation for resurfacing the road at the end of April.

Work on the lower section of the High Street below the steps next to Coppers will start week beginning 10/4 but residents and retailers affected will be notified in advance to discuss access requirements to the shops and private car park entrances and potential alternative arrangements.

Second week update report

Beckenham Junction works have proceeded in line with expectations. Paving and kerbing work is now almost complete.

The High Street arm of the junction has now been adjusted bringing the approach to the traffic lights back to two lanes, with the traffic light re-sequenced. Traffic queuing has generally been reduced and traffic continues to be able to turn right into Southend Road from Albemarle Road. Work on the Thai Restaurant Corner and around into Rectory Rd has been completed and all barriers have been removed. Work on the raised footway between Coppers Restaurant and the Spa have been completed and the steps reopened.

About the scheme

The scheme is designed to make the town more attractive to visitors and shoppers by day and night. A major objective is to support existing businesses and encourage new businesses to invest in the town centre. The High Street investment improvements will create a more attractive and safer pedestrian environment. Improvements will include new paving and road surfacing, improved and attractive lighting, improved road crossings and bus waiting facilities, better facilities for cyclists and improved amenity spaces including Beckenham Green.

Extensive planning and consultation has been carried out since the scheme was proposed in 2012. The cooperation and input of the Beckenham Business Association and the Copers Cope Resident Association is gratefully acknowledged, with their input key in shaping the nature of the scheme.

Sign up for regular newsletter updates

Businesses and interested residents who want to follow the progress of the work over the next 18 months can sign up for the regular updates that will be sent. Visit www.bromley.gov.uk/beckenhamimprovements to do this where the latest detailed traffic diversions are listed including information about bus routes and a link to TfL’s website www.tfl.gov.uk/BusChanges.

Thank you for your understanding and support

Every effort is being made to minimise disruption and your understanding and support is appreciated in advance if there are unforeseen issues which need to be resolved. If further specific information is needed, please contact Conway’s Helen McConnell who can be contacted, for help and advice. Helen, the Liaison Officer is the scheme contact for businesses and residents. Helen can be contacted on Mobile Tel 07917 518 529 or email Beckenham@fmconway.co.uk if needed.

Leave a comment

Filed under Council, Environment, News, Planning, Transport

PLANNING and DEVELOPMENT Bulletin 04 – September 2016

 

This is the latest of our regular bi-monthly updates on planning and development in the Copers Cope area.  Our aim is to provide you with a concise and informative snapshot of recent planning applications, decisions and appeals.

 

Refusal of a Major Residential Development on Worsley Bridge Road 

The large-scale residential development planned behind the Dylon site, near to Lower Sydenham Railway Station at the northern end of Worsley Bridge Road, has been dismissed at appeal.

The site, presently occupied by Footsies Social Club and playing fields, is on a wedge of open land situated between the New Beckenham / Lower Sydenham rail line and the Pool River, and is next to the old Dylon site where 220 flats are currently under construction.

In February last year an application (15/00701/FULL1) was made to demolish the existing single-storey buildings on the edge of the Footsies site and construct a building of varying height, from eight to twelve storeys, to provide 296 residential units, a new estate road, parking and cycling spaces and landscaping of land to be accessible by the public.  The scheme comprised of 148No. one-bedroom, 135No. two-bedroom and 13No. three-bedroom flats.  In September last year the application was refused and became the subject of an appeal, which was later withdrawn.

A second application, for a slight variant of the above scheme, but with 253 dwellings, had also been lodged by the developer (15/04759/FULL1). This, too, was refused and the applicant subsequently appealed against the decision.

The appeal hearing was finally held over several days in May and the Planning Inspectorate released its decision last month to dismiss it.

The principal reasons for the dismissal are the effect the proposal would have on:

  1. The area of Metropolitan Open Land (MOL) on which it sited;
  2. The effect on the character and appearance of the surrounding area, in terms of the design, scale, density and risk of flooding;
  3. The amenities of occupiers of the future dwellings in terms of natural ventilation, solar gain and noise.

Click here to read the Planning Inspector’s Report

Beck House, 36A Copers Cope Road 16/02136/FULL1

Permission has been granted to construct a new, four-storey rear extension and an additional storey on top of the existing block of flats to create an additional 8No. two-bedroom and 1No. three-bedroom flats in connection with the existing 4No. two-bedroom and 1No. three bedroom flats which will be remodelled.

87A Bromley Road 16/02120/FULL1

Consent has also been given to demolish the existing two-storey house situated on the triangular plot of land between Bromley Road and Albermarle Road, close to Bishop Challoner School, and replace it with a part-three, part-four-storey block comprising 9No. two-bedroom flats.

Conifer House, 44 Southend Road 16/02179/FULL1

Planning permission has been granted to enlarge and refurbish this empty, three-storey block of flats on Southend Road, opposite the Stumps Hill Lane bus stop.  This includes  building an additional storey plus four-storey front and rear extensions to create 8No. flats in addition to the 10No. existing.  The new additions will comprise 1No. one-bedroom, 4No. two-bedroom and 3No. three-bedroom flats.  The existing 2No. one-bedroom, 6No. two-bedroom and 2No. three-bedroom flats will also be remodelled.

213 Kings Hall Road 15/04458/OUT

Last year, two outline planning applications were made to develop the land to the rear of 213 Kings Hall Road including part of the side garden of 215.  The initial proposal was for 5No. detached four/five-bedroom houses and gardens.  This was refused by the Council on the grounds of overdevelopment of the site.  Later in the year, a second application was made reducing the number of houses to 3No. however this was subsequently refused also, for the same reason.  The applicant has since lodged an appeal against the latest decision.  At the time of writing a date for the appeal hearing had yet to published.

3 Beckenham Road (above Barclays Bank) 16/02218/FULL1

Planning permission has been refused for a scheme involving the addition of three residential storeys on top of the existing, two-storey Barclays Bank building opposite the cinema.

The development comprised of 2No. one-bedroom and 6No. two-bedroom flats on the third and fourth floors, and a large, three-bedroom penthouse on the fifth floor.

The reasons given for refusal were that the proposal would be visually obtrusive, due to its design, scale, bulk and height; would detract from views in and out of the area; and would be detrimental to the character of the adjacent High Street Conservation Area.

20 Crescent Road 16/02752/FULL

An application to demolish a large 1890s Victorian villa house on a prominent corner near Chancery Lane and replace it with flats has fortunately been refused consent.  There was passionate opposition to the application by local residents, the Chancery Lane and Limes Road Residents’ Association and CCARA, with many letters of objection and a petition being sent to the Council.

10 Copers Cope Road 16/02834/FULL

A retrospective planning application for a basement and ground floor dwelling, that has already been built in the rear garden, has been refused permission.

No 10 is described as a four-storey, end-of-terrace hotel building that has been extensively  refurbished.  Last year the owner was granted permission to build a structure in the rear garden to provide additional facilities for the hotel, including a laundry, fitness room, staff room, office, toilets and storage.

The building has since been repurposed to become a three-bedroom dwelling, without permission.  The building has also been found to be larger than the original consent allowed, and includes a second lightwell that wasn’t on the consented drawings.

Enforcement action is now being taken by LBB in addition to the refusal of the retrospective application.

Carlton Court, Beckenham Road 16/03105/FULL

A planning application has been submitted to add another storey to the two-storey flats, situated at the junction with Hayne Road, to provide 2No two-bed and 2No one-bed flats.

 

CHANGE OF USE FROM COMMERCIAL TO RESIDENTIAL

Three years ago, the Government relaxed the planning laws to make it very easy to convert office premises to residential use.  Over this period, the majority of office space on Beckenham High Street, much of which was fully-let and in demand, has been given approval to be converted to flats.

The largest of these include St Brides’s House, now practically complete, Marqueen House, Ironstone House and Provident House on Burrell Row, and Kelsey House at Thornton’s Corner (recently subject of a second application, see below). As a result, many thousands of square feet of purpose-built office space have been lost and cannot be reclaimed.

Burnhill House, 50 Burnhill Road 16/02466/RESPA

At the end of July Bromley Council granted ‘prior approval’ consent for the last remaining large office building on Beckenham High Street to be converted into flats.

50 Burnhill Road, had been the subject of an application to convert the building, situated adjacent to Lidl supermarket, into flats last year.  The council initially refused to grant consent, on the grounds that the proposal had inadequate provision for car parking, and would cause problems with highway safety on such a narrow section of the road.  An appeal by the applicant was dismissed earlier this year, however a new application for the same scheme, but accompanied by a blank legal agreement promising the flats to be ‘car-free’ dwellings, was submitted in May and regrettably the Council capitulated.

CCARA objected strongly against this application as, in our opinion, it provides an extremely poor and cramped standard of living accommodation. Other areas of concern are what appear to be multiple entrances to the development, no provision for refuse storage and an impractical proposal to store 14 bicycles in the Burnhill Road entrance lobby.  It will be interesting to observe whether this ‘car-free’ agreement, implemented by other developers of commercial-to-residential buildings in Beckenham, will work in reality particularly as Bromley has the the third highest number of car owners out of all the boroughs of Greater London.

Kelsey House, 77 High Street 16/02649/RESPA

Prior approval has been refused for an application to convert the four storeys of office space above the Kelsey House Bar & Kitchen to twenty flats, comprising of 8No. one-bedroom and 12No. two-bedroom (3 person) dwellings.  Reasons given for refusal were the lack of an environmental noise assessment and that future occupiers of the dwellings could be negatively affected by noise from the Bar & Kitchen on the ground floor and other neighbouring commercial premises.  The building is also in a medium flood risk zone and no flood risk assessment had been submitted with the application.

Last summer, a prior approval application had been granted for sixteen flats.

The freehold building is currently on the market for £4 million.

171a High Street 16/02021/RESPA

Following refusal earlier this year, Prior Approval has now been granted to convert the commercial space above Beckenham Pharmacy to 1No two-bedroom flat.

9 Kelsey Park Road 16/02126/RESPA

Prior Approval has been given to convert the two floors of office space above Grand Cru Co wine merchants to 1No three-bedroom flat and 1No two-bedroom flat.

1 Comment

Filed under Environment, News, Planning

Beautiful Guerilla Gardening in The Avenue Beckenham – well done whoever you are :-)

thumbnail_20160501_185433

Leave a comment

by | 12/05/2016 · 21:07

Beckenham Place Park proposals get stage 1 approval – local public consultation dates in Beckenham.

Lewisham Council has secured a Round 1 pass from the Heritage Lottery Fund’s (HLF) Parks for People programme.  The Mayor of London has approved the HLF bid and the public golf course will close at some point.

Draft proposals for the restoration and regeneration of the park and buildings have been developed and The Council would like to hear your views about these plans. The comments received will be used to inform the next stages of planning the project.

The plans will be available at a series of exhibitions and events over the coming weeks. The events will be staffed by members of the project team who will be on hand to explain the proposals and to answer any questions you may have.

The programme of exhibitions is shown below.

  • Saturday 5 March 2016, 11.00 am – 3.00 pm, Sainsburys forecourt Beckenham High Street, Beckenham 
  • Wednesday 9 March 2016, 1.00 pm – 6.00 pm, 14 -15 Catford Broadway (Opposite Costa Coffee), Catford
  • Sunday 13 March 2016, 2.00 pm – 4.00 pm, Beckenham Place Park Mansion House Visitor Centre.
  • Monday 14 March 2016, 9.00 am – 11.30 am, The Green Man, 355 Bromley Road.
  • Monday 14 March 2016, 12 noon – 4.00 pm, Bellingham High Street (Shop next to the Post Office),14 Randlesdown Road.
  • Thursday 17 March 2016, 3.00 pm – 5.00 pm and; 7.00 pm – 8.30 pm, Evangelical Church Hall, Cromwell Road, Beckenham.
  • Monday 21 March 2016, 6.00 pm – 9.00 pm,The Green Man,355 Bromley Road.
  • Saturday 26 March 2016, 11.00 am – 3.00 pm, Beckenham Place Park Mansion.

These exhibitions are being run as drop in sessions, with the same plans and surveys available at each session. You do not need to confirm your attendance and these sessions are all open to the public. Therefore please pick a date, time and venue that is most convenient for you.

Further public consultation will be carried out later in Summer 2016 prior to the submission of the final proposals to the Heritage Lottery Fund.

Enquiries about the project should be directed to  Alison Taylor, Project Manager, Lewisham Council by email bpp@lewisham.gov.uk or on 0208 314 8758.

 

1 Comment

Filed under Environment

Bromley Council choose not to register Elmers End Green as a Town Green

Earlier this year the West Beckenham Residents’ Association (WBRA) lodged an application to have Elmers End Green registered as a Town or Village Green. Bromley Council had previously attempted to sell the freehold for the toilet block on the Green (this is now currently being sold by leasehold). This raised concern, and local people wanted to ensure Elmers End Green was a protected green space. At our AGM, Copers Cope Area Residents’ Association members agreed to support WBRA’s application and our Association wrote in support to the Council and our local councillor on the committee. Unfortunately the Council voted against registering Elmers End Green as a Town or Village Green.  An application has been lodged by The Beckenham Society to register Beckenham Green we hope the Council will approve this application.  The Council can choose to register both sites voluntarily. If you think the Council should register these sites voluntarily please complete our poll at the bottom of this blog.

West Beckenham Residents’ Association released the following statement:

WBRA are very disappointed that the Council’s Executive Committee rejected the opportunity to register Elmers End Green as a Town or Village Green. The proposal was based on the special history of Elmers End Green. This triangle of land has been in exactly the same place at the junction of the road between Beckenham and Croydon and that to West Wickham for at least 300 years – undeveloped and open space used by residents of the then small Elmers End hamlet right up to the present day. If this doesn’t qualify as a town green, we don’t know what will. Dozens of local people wrote to the Leader of the Council in support of the proposition, as did eminent local groups such as Copers Cope Area Residents’ Association, Elmers End Free Church, The Beckenham Society and Bromley Local History Society. All councillors for Clock House and Kelsey and Eden Park wards supported our proposal.

The Development Control Committee had, in July, recognised the value of local history in fostering community spirit – at no cost. They felt registration would show the Borough in its best “Clean and Green” form and were enthusiastic for registration. Here was a committee that actually listened to what we were saying! On 10 September, Councillor Alan Collins gave a spirited and eloquent exposition of the case in favour. The Executive Committee however dismissed the Development Control Committee’s recommendation for registration without a shred of empathy for local people. Instead they just dismissed the dozens of emails and letters supporting the proposal and dragged up excuses to do nothing.

WBRA could understand (just a little) if we were asking them to spend thousands on the Green, but registration would cost virtually nothing. It is very depressing when our elected representatives show such little regard for the wishes of the electorate.

 

Leave a comment

Filed under Council, Environment

Consultation: Conservation Area for Beckenham Town Centre

At the Council run Beckenham Town Centre Working Group that the Copers Cope Area Residents’ Association attends with other local community organisations it was agreed to progress the idea of creating a conservation area running the length of the whole Town Centre.  Currently there is a small conservation area at Kelsey Square and a larger one covering St George’s Church, Beckenham Green and Bromley Road School. By extending the conservation area and linking both existing ones Beckenham will be able to preserve and enhance the High Street buildings and ensure that new shop fronts are in keeping.  Our Association is in support of this proposal that will see, over time, our beautiful Art Deco parade restored to its former glory and the design of shop fronts more sympathetic to the age of the buildings through out out the town.

The Council have now prepared the long awaited proposal to create a Beckenham Town Centre Conservation Area. Local people are encouraged to comment on the proposal.  The deadline for feedback is 24 October 2014. If you would like to comment on this proposal, please download the questionnaire, complete and either email it to conservation@bromley.gov.uk or post it to Bromley Council, Room P41, Civic Centre , Stockwell Close BR1 3UH.

Further information about the proposed conservationConservation_area area can be found at the links below:

Beckenham Conservation Area

Beckenham Town Centre Character Assessment

 

Leave a comment

Filed under Council, Environment

Harris Beckenham discussed in Parliament

The debacle of the new primary school to be located at Harris Beckenham Academy off Manor Way that issued school places and was refused planning permission earlier this year was discussed in Parliament on 12 Sep 2014. You can read the transcript below:

Bromley School Places

 

 

 

Leave a comment

Filed under Environment

Beckenham Green Friends spruce up some unloved spots

Our Beckenham Green Friends Group has been busy planting and weeding some unloved spots in the town.  The forlorn round bed on Beckenham Green is now vibrant with colour. The unsightly patch by the Waitrose sign has been planted with some flowers and hardy shrubs we hope will grow strong and tall (to disguise all the litter and cigarette butts dropped in that area).

If you have any free time to help, or some plants to spare, please contact Copers Cope Area Residents’ Association – email: chairman@coperscope.org.uk

green waitrose

 

 

 

 

 

 

 

 

 

Leave a comment

Filed under Environment

Flood storage to be built in Beckenham Place Park

A consultation is underway on plans to build a large flood storage reservoir in Beckenham Place Park. If built it will have a dramatic effect on the park.

Further information can be found on Lewisham Council’s website at:

Lewisham and Catford Flood Alleviation Scheme

Beckenham residents that use the park may wish to comment on the consultation. The Environment Agency is holding events to get feedback to help shape the final scheme. The events will be held on:

  • Friday 4 July, 10am to 3pm, Lewisham Shopping Centre
  • Thursday 17 July, 10:30am to 1pm, Catford Civic Suite
  • Thursday 17 July, 1:30pm to 3pm , the market on Catford Broadway
  • Saturday 26 July, 10am to 2:30pm, Ravensbourne Community Centre

Alternatively, if you can’t attend on these days but would like more information about the project, you can contact Richard Peddie at the Environment Agency on 01252 729541 or email pso.selondon&nkent@environment-agency.gov.uk.

 

2 Comments

Filed under Environment

New sensory garden opens in Beckenham Place Park

The garden is a space for users to escape the hustle and bustle of urban life in a corner of the park that has been transformed to stimulate all five senses – sight, sound, smell, taste and touch.  It includes features, designed to attract wildlife and create sound including bird baths and feeders, as well as textured floors and raised beds.

The garden has been created for the entire community and includes seating areas, a disability ramp, a wheelchair friendly picnic bench and wheelchair accessible footpaths. A trip to the garden will enhance the physical and emotional well-being of all visitors and residents with a disability, such as dementia or a visual impairment, will be able to enjoy nature in a safe and tactile environment.

 

1 Comment

Filed under Environment

Small electrical recycling bank set up in Beckenham

SMALL electrical items can now be recycled at six new recycling banks which have been set up across Bromley. Beckenham has one in Tescos car park at Elmers End.

Any small electrical with a battery or a plug can be recycled, plus batteries and low energy lightbulbs.

1 Comment

Filed under Environment, News